Why is a Labor Line Missing from the Install Schedule / Calendar?

Why is a Labor Line Missing from the Install Schedule / Calendar?
In order for a labor line to show on the Install Calendar, it must have an Accumulator Code set up in the catalog for the principal labor item. Without an Accumulator Code, the principal labor line will not show on the Install Schedule / Calendar. The attached documentation covers Accumulator Code set up and usage of the Install Schedule. 

Note: you will typically only need one labor line item as your “principal” labor catalog item. That will be the line that tells the program the total yardage/footage to be installed.

The other labor lines (such as rip up, stairs, haul away, etc.) should not be considered “principal” labor items in the system or the result will be an over-estimation of the total labor required for a given day.  More than one “principal” labor line on a job is fine, but it must relate to another installation service, such as tile or hardwood, or a different carpet installation.


1.png

 Selecting an Accumulator Code

 
Was this article helpful?
0 out of 0 found this helpful